Project Documents
Links to and downloads of project documents:
Environmental Impact Report (EIR) Phase
Design Phase
- Hatch Mott MacDonald / RMC Water & Environment Proposal for Engineering Services
Design Documents
- 80%+ Design Level Drawings (60 MB PDF)
- 80%+ Design Level Drawings, pages C01-05 (2.2 MB PDF)
- 80%+ Design Level Drawings, pages CP01-07 & E3 (2.2 MB PDF)
- 80%+ Design Level Drawings, pages EM01-05 (4.7 MB PDF)
- 80%+ Design Level Drawings, pages EM06-10 (4.7 MB PDF)
- 80%+ Design Level Drawings, pages EM11-15 (3.7 MB PDF)
- 80%+ Design Level Drawings, pages EM16-20 (3.8 MB PDF)
- 80%+ Design Level Drawings, pages EM21-25 (4.2 MB PDF)
- 80%+ Design Level Drawings, pages EM26-29 (3.3 MB PDF)
- 80%+ Design Level Drawings, pages G01-07 (2 MB PDF)
- 80%+ Design Level Drawings, pages GC01-05 (1.3 MB PDF)
- 80%+ Design Level Drawings, pages GC06-10 (780 KB PDF)
- 80%+ Design Level Drawings, pages GC11-15 (937 KB PDF)
- 80%+ Design Level Drawings, pages GC16-21 (1.2 MB PDF)
- 80%+ Design Level Drawings, pages GM2 & GS01-05 (2.5 MB PDF)
- 80%+ Design Level Drawings, pages M01-05 (762 KB PDF)
- 80%+ Design Level Drawings, pages PI01-03 (665 KB PDF)
- 80%+ Design Level Drawings, pages PP01-05 (3.1 MB PDF)
- 80%+ Design Level Drawings, pages PP06-10 (3.3 MB PDF)
- 80%+ Design Level Drawings, pages PP11-15 (2.4 MB PDF)
- 80%+ Design Level Drawings, pages PP16-20 (2.4 MB PDF)
- 80%+ Design Level Drawings, pages PP21-25 (2.6 MB PDF)
- 80%+ Design Level Drawings, pages PP26-29 (2.1 MB PDF)
- 80%+ Design Level Drawings, pages S01-06 (724 KB PDF)
- 80%+ Design Level Drawings, pages T01-05 (1.1 MB PDF)
- 80%+ Design Level Drawings, pages T06-10 (1 MB PDF)
- 80%+ Design Level Drawings, pages T11-15 (1 MB PDF)
- 80%+ Design Level Drawings, pages T16-20 (1 MB PDF)
Mitigation Monitoring & Reporting Program (MMRP)
Notices and Meeting Agendas
List of Pre-Qualified Bidders
- Mountain Cascade, Inc.
- Preston Pipelines, Inc.
- Steve P. Rados, Inc.
- Ranger Pipelines, Inc.
- Sundt Construction, Inc.
- Teichert Construction
Clipper Creek Siphon Replacement Project
|